WHAT ARE THE PROJECT IMPROVEMENTS?

Proposed multimodal improvements include designated bicycle lanes and sidewalks and improved transit stops that meet the Americans with Disabilities Act (ADA) compliance standards. Roadway improvements south of 7th Ave. will include milling and resurfacing, curb and gutter and drainage facilities. North of 7th Ave., the roadway pavement will be reconstructed with the addition of curb and gutter and drainage facilities.

WHAT IS THE PROJECT SCHEDULE?

Corridor Study – Completed in 2015

Public Meeting – Reintroduction of Project – April 24, 2019    <<< WE ARE HERE.
Sun Valley Nieghborhood Center, 115 W. 6th Ave. (corner of Sun Valley Blvd. and 6th Ave.)
5;30pm – 7:00pm with a presentation at 6:00pm

30% Design – May/June 2019

Public Meeting – 30% Design – June/July 2019

60% Design – December 2019

Final Design – December 2020

Construction Begins – Spring 2021

Construction Complete – Fall 2022

WHAT WILL THE TRAFFIC IMPACTS BE DURING CONSTRUCTION?

Traffic impacts during construction may include shoulder and single lane closures south of 7th Ave. North of 7th Ave., temporary lane closures, requiring two-way traffic control, are anticipated to reconstruct the roadway.

WHAT IS THE PROJECT COST AND HOW IS IT BEING FUNDED?

With an estimated cost of approximately $50,000,000, the project will be funded with local RTC fuel tax dollars.

WHAT UTILITY IMPROVEMENTS AND IMPACTS ARE EXPECTED?

Possible utility impacts, resulting from necessary drainage improvements, will be determined as the preliminary design progresses.

HOW CAN I STAY INVOLVED AND LEARN MORE ABOUT THE PROJECT?

• Sign up to receive project updates here

• Please call or contact

RTC Project Manager: Maria Paz Fernandez, P.E.

(775) 335-1861

mpazfernandez@rtcwashoe.com